Skip to main content

Table 3 Total path monitor and traffic counts at the intervention and control parks at the three time-points

From: The REVAMP natural experiment study: the impact of a play-scape installation on park visitation and park-based physical activity

  Intervention Park Control Park
T1 T2 T3 T1 T2 T3
Path monitor counts 1137 1499 1495 6067 6030 6541
Traffic counts 2336 2780 2903 2995 2325 2439