Skip to main content

Table 7 Costs of intervention delivery

From: Results of a feasibility cluster randomised controlled trial of a peer-led school-based intervention to increase the physical activity of adolescent girls (PLAN-A)

Item

All schools

Total cost (£)

Average cost per school (£)

Average cost per Year 8 girl (£)

Pre-intervention preparation

490.55

122.64

1.70

Student briefing

223.71

55.93

0.77

Peer nomination

444.35

111.09

1.54

PS meeting

383.20

95.80

1.33

Two-day PS training

   

 Trainer fees and travel

2940.22

735.06

10.17

 Student and school contact travel

440.00

110.00

1.52

 Venue hire a

566.80

141.70 (188.93)

1.96

 Refreshments

904.40

226.10

3.13

 Resources and equipment

1109.51

277.38

3.84

Two-day PS training total

5960.93

1490.23

20.63

Top-up PS training

   

 Trainer fees and travel

1427.26

356.82

4.94

 Student and school contact travel

245.00

61.25

0.85

 Venue hire a

332.40

83.10 (110.80)

1.15

 Refreshments

539.14

134.79

1.87

 Resources and equipment

630.97

157.74

2.18

Top-up PS training total

3174.77

793.69

10.99

Post-intervention materials

63.84

15.96

0.22

Total intervention cost

10741.35

2685.34

37.17

  1. a Peer supporter training for one school was held on the school site and incurred no venue hire cost. Average venue hire cost was (£188.93 & 110.80 for the two-day and top up days training respectively) across the three schools